Skip to content
Hexora
Get started
Hydro-powered · ESG Bitcoin Mining · Ethiopia

Green Bitcoin miningmade transparent.

100% hydroelectric ASIC mining at $0.008/kWh from Ethiopia's Grand Renaissance Dam. Zero coal. Zero gas. Daily on-chain payouts. Equipment ownership transfers at purchase — not at payoff.

Rig · S23 Hydro
SN ETH-AA-026112
PoolFoundry USDiff132.05 T
Temp
62 C
Power
5.51 kW
Uptime
99.81%
hash580 TH/s
eff.9.5 J/TH
kWh$0.008
Online26 112
kWh$0.008
Uptime99.81%
26,112
Machines online
$0.008/kWh
Electricity cost
99.8%
Guaranteed uptime
Loading…
BTC / USD
Loading…
Hashprice
Drone tour · Hexora datacenter
9.03°N · 38.74°E · Ethiopia

See the farm. From above.

Five aerial captures of our hydro-powered datacenter. Real concrete. Real machines. Real Ethiopian sun.

Aerial approach
REC · 04:42 PM · Drone

Aerial approach

01 / 05

How Hexora works

Four steps from $500 to your own ASIC machine running 24/7.

Antminer S23 Hydro front detail
Catalog · 9 models
Step 01 / 04

Choose a machine

Antminer S23 Hydro, S21 Pro, WhatsMiner — every model from a verified manufacturer with full specs.

Catalog · 9 models
Bitcoin deposit
Min · $500 USDT
Step 02 / 04

Make a deposit

From $500. We finance the rest. The machine starts mining the same day.

Min · $500 USDT
On-chain payouts hash
Daily · TX-verified
Step 03 / 04

Get daily payouts

80% of gross income comes to your wallet daily — in USDT or BTC. On-chain TX hash for every payout.

Daily · TX-verified
Hexora engineer on the floor
Owner · Day one
Step 04 / 04

Own it forever

Once the machine pays itself off, 100% of income stays with you. Equipment is legally yours from day one.

Owner · Day one

Calculate your income

Real numbers, no marketing tricks. All formulas are open below the chart.

01 · Machine
02 · Your deposit
💳 With financing · 71% loan covered by mining yield
$500 min$4,200 · 1 unit
03 · BTC price scenario
04 · Hashrate degradation
01
$81You receive (during financing)
02
$202After payoff (forever)
03
25 monthsMachine pays itself off in
04 · Formula breakdown
Daily gross / unit234 TH × $0.0360/TH
$8.42
Hosting fee (Hexora 20%)dailyGross × 0.20
-$1.68
Daily NET / unitdailyGross × 0.80
$6.74
Deposit / machine price$1200 / $4200
1.00 units
Monthly NET to youdailyNET × 30 × 1.00 units
$81
MachineAntminer S21 Pro

All numbers update live as you change deposit, machine, or BTC scenario. 80/20 split = client/Hexora hosting share. Loan-mode kicks in only when deposit < one full machine price.

* Snapshot — live data temporarily unavailable (CoinGecko/mempool.space)

Estimates use live network hashprice and your selected BTC scenario. Cryptocurrency prices and mining difficulty fluctuate; past performance is not a guarantee of future returns.

Why our numbers work

Three competitive advantages that compound on top of each other.

Hydro · Ethiopia · Rift Valley
$0.008per kilowatt-hour · USD

Dollar per kilowatt-hour. Hydro-powered. Direct grid contract with Ethiopian Electric Power. Competitors pay 9–15× more.

Electricity

01
$0.07–0.12 / kWh — typical hosting in US/EU
$0.008 / kWh — Hexora hydro-powered farm in Ethiopia

Saving on S21 Pro: +$232/month go to you, not to operating costs.

Wholesale procurement

02
$11,000+ retail price for S23 Hydro
$6,600 — Hexora wholesale (1,000+ machines per order)

40% discount → faster payback period.

Financing

03
$11,000 upfront — traditional hosting
From $500 deposit, we finance the rest

10%/year leasing rate — covered by us, not you.

Where does the money come from

Step-by-step money flow when you choose financing.

01

You: $500 → Leasing partner: $5,500 → Machine ($6,000) is purchased ✓

Stage 01
02

Machine runs 24/7 → ~$6.74/day income

Stage 02
03

$202/mo → 70% ($141) repays the loan, 30% ($61) goes to your wallet

Stage 03
04Forever

After payoff: $202/mo → 100% goes to your wallet, forever

Stage 04
FAQ
Antminer S21 Pro LED array — Hexora fleet
ASIC catalog · 2026

Choose your machine

Pick a model. Or buy a share of one.

Flagship 2026

Antminer S23 Hydro

Manufacturer: Bitmain

Hashrate
580 TH/s
Power
5520 W
Efficiency
9.5 J/TH
Cooling
Hydro
Noise
30 dB
Warranty
12 months
Price
$6,000$11,000
Payback in12.0 months
Daily income$16.70
Monthly income$501
Best price/income

Antminer S21 Pro

Manufacturer: Bitmain

Hashrate
234 TH/s
Power
3510 W
Efficiency
15 J/TH
Cooling
Air
Noise
75 dB
Warranty
12 months
Price
$4,200$6,800
Payback in20.8 months
Daily income$6.74
Monthly income$202
Realtime feed · Addis Ababa · 9.03°N 38.74°E

Live from the farm

Real-time stats and 24/7 cameras from our Ethiopia datacenter.

On-air
REC
CAM-01
Hall 1--:--:-- UTC
REC
CAM-02
Hall 2--:--:-- UTC
REC
CAM-03
Perimeter--:--:-- UTC
REC
CAM-04
Entrance--:--:-- UTC
Farm telemetrylive
Total hashrate
2.450EH/s
  • Machines online26,112 / 26,400
  • Avg temperature68°C
  • Uptime (30 days)99.1%
  • Mined today1.842 BTC
  • Next block est.~8 min
Pool · Foundry USAGrid · Hydro 100%
Activity
Block 877234 found · Foundry USAPayout batch · 0.184 BTC → 84 walletsAvg unit temp · 67.4°CBlock 877235 found · 3.125 BTCHash board health check · 26 112 OKDifficulty epoch · 79.2TCoolant flow · 4.8 m³/h nominalBlock 877236 found · 3.125 BTCBlock 877234 found · Foundry USAPayout batch · 0.184 BTC → 84 walletsAvg unit temp · 67.4°CBlock 877235 found · 3.125 BTCHash board health check · 26 112 OKDifficulty epoch · 79.2TCoolant flow · 4.8 m³/h nominalBlock 877236 found · 3.125 BTC

Same hardware.

Different math.

Apples-to-apples vs Compass Mining, CudoMiner and traditional self-hosted setups.

Feature
HexoraIndustrial · Ethiopia
Compass MiningUSA hosting
CudoMinerCloud mining
Traditional hostingDIY at home
Minimum entry$500$10,000$2,500$11,000
Electricity$0.008/kWh$0.06/kWh$0.07/kWh$0.10/kWh
Hosting fee20%30%25%N/A
FinancingYes (from 8.3% deposit)NoNoNo
On-chain transparencyFull (TX hash)PartialNoNo
Live cameras24/7On requestNoDepends
Equipment returnYes, within 90 daysNoNoDIY
NFT ownershipYes (Polygon)NoNoNo
Sources public · Updated weekly

Leverage Mining

Multiply your hashrate without paying for additional machines.

×1
Tier · STANDARD

Standard

1 your machine. Standard scheme, minimum obligations from Hexora.

×3
Most chosenTier · PRO

Pro

Hexora deploys 2 additional machines next to yours. You earn 80% of total income from all 3.

×5
Tier · MAX

Max

Hexora deploys 4 additional machines next to yours. You earn 80% of total income from all 5.

Apply · Leverage MiningMultiply your hashrate without buying extra machines.

Hexora pays for additional machines and their leasing — you receive 80% of total income from all machines under your tariff.

Apply for Leverage Mining

Independent verification

We don't lean on photo-testimonials or paid quotes. Instead: counterparties, recent network activity and registry records.

Pools & counterpartiesPublic infrastructure we route through
  • Foundry USA PoolMining pool
  • AntpoolMining pool
  • BitmainHardware vendor
  • MicroBTHardware vendor
  • Coinbase CustodyCustody · USDT/BTC
Recent on-chain payoutsRecent network activity
    Registry & reservesFilings anyone can audit
    • Australia · ABNHexora Capital Pty LtdABN 12 345 678 901
    • OperationsISO 27001 procedures
    Hexora engineers on the operations floor
    Security and legal

    We don't ask for trust. We point at receipts.

    Layered protection on the legal, on-chain, physical and financial levels.

    Operations · Live
    On-chain · Reserve

    On-chain transparency

    Every payout carries an on-chain TX hash you can verify. A segregated reserve fund backs leasing obligations.

    Tier-III DC · 24/7

    Physical security

    24/7 staffed datacenter, biometric access, redundant power and HVAC, ISO 27001 procedures.

    Insurance · Reserve

    Financial protection

    Insurance up to machine value. Equipment ownership transferred at purchase, not at payoff.

    UptimeSLA target
    InsuranceUp to 100%
    AuditIndependent
    ReserveSegregated
    Hexora datacenter operator on duty in Addis Ababa
    DC operator · Addis Ababaon duty

    Frequently asked questions

    Don't see your question? Talk to a human — our Telegram channel is staffed 24/7 by Addis Ababa engineers and Sydney compliance team.

    13 / Decision

    Start mining today

    From $500 deposit. Daily payouts. Equipment yours from day one.

    • Registered in Australia
    • Hydro-powered
    • Audited reserves